|
|
Oral Programme G2GOCE and other New Missions: Technical Challenges and Scientific ApplicationsConvener: T. Gruber 
Co-Conveners: F. Flechtner  , R. Biancale  , T. Mayer-Guerr
 Add this Session to your Personal Programme
Tuesday, 21 Apr 2009 Room: 26
| | GRACE Data Analysis
| |
|
08:30–08:45
|
EGU2009-1424 Progress towards next generation GRACE gravity field data products S Bettadpur and CSR-L2 Team
|
|
|
08:45–09:00
|
EGU2009-8714 Gravity Field Determination at AIUB: Current Activities A. Jaeggi, G. Beutler, L. Prange, U. Meyer, L. Mervart, R. Dach, R. Rummel, and T. Gruber
|
|
|
09:00–09:15
|
EGU2009-7148 Assessing mass change trends in GRACE models C. Siemes, X. Liu, P. Ditmar, E. Revtova, C. Slobbe, R. Klees, and Q. Zhao
|
| | GOCE Status
| |
|
09:15–09:30
|
EGU2009-6282 GOCE: First In-Orbit Experience R Floberghagen, D Muzi, M Fehringer, D Lamarre, B Frommknecht, G Vingione, A Tesseri, M Kern, G Plank, R Haagmans and the GOCE Operations Team
|
|
|
09:30–09:45
|
EGU2009-3051 Accelerometers for the GOCE Mission: on-ground verification and in-orbit early results B. FOULON, B. CHRISTOPHE, and J.-P. MARQUE
|
|
|
09:45–10:00
|
EGU2009-5375 GOCE L1b data processing B. Frommknecht, C. Stummer, G. Vingione, and R. Floberghagen
|
COFFEE BREAK | |
|
10:30–10:45
|
EGU2009-2862 GOCE Science Data Processing System – Status and Plans R. Rummel, Th. Gruber and the European GOCE Gravity Consortium Team
|
|
|
10:45–11:00
|
EGU2009-6763 Gravity gradient preprocessing at the GOCE HPF J. Bouman, S. Rispens, T. Gruber, E. Schrama, P. Visser, C.C. Tscherning, and M. Veicherts
|
| | Future Gravity Field Missions
| |
|
11:00–11:15
|
EGU2009-8516 GRAF - A GRACE follow-on mission feasibility study F. Flechtner, K.H. Neumayer, B. Doll, J. Munder, Ch. Reigber, and J.C. Raimondo
|
|
|
11:15–11:30
|
EGU2009-9314 GRACE-FO: seeking an optimal mission scenario R. Biancale, J.-M. Lemoine, S. Bruinsma, F. Perosanz, and E. D. da Costa
|
|
|
11:30–11:45
|
EGU2009-2184 Next Generation Gravity Mission: a Step Forward in the Earth’s Gravity Field Determination P. Silvestrin, M. Aguirre, L. Massotti, and S. Cesare
|
|
|
11:45–12:00
|
EGU2009-10285 Future satellite missions for time-variable geopotential recovery - results from the ESA Mass Transport Project T. Reubelt, N. Sneeuw, P.N.A.M. Visser, T. van Dam, and M. Losch
|
|